PURPOSES
To support the excavation and construction works, a self-supporting Berlin wall has been designed. Basically, the design involves constructing a diaphragm wall, 10 meters deep, and then in one shot excavating down 3 m.
CLIENT
DONINELLI ARCHITETTI, 2022-2023.
WHAT WE DID
Excavation works can be complex and challenging, and ensuring safety is always a top priority. The design of a Berlin tie-back wall is an effective solution to provide stability, space around the building site and prevent collapse in the excavation sites.
The ability to complete excavation works efficiently can be critical for projects where excavation is a significant part of the construction process.
Furthermore, increasing excavation security with the design of a tie-back wall was an excellent example of prioritizing safety and space. It showed a commitment to efficiency, safety, and excellence in construction practices.